|
Condominium
Construction on Florida’s Gulf Coast: Opportunity for Profit, or Failure?
|
From the mid
1980’s to the present, a dramatic increase in the demand for
leisure-use properties and second homes on Florida’s Panhandle
coastline has produced a unique property development and construction
climate. The demographic
matrix that currently exists is largely driven by baby boomers’
financial prosperity and the ever-increasing mobility of Americans in
general. The demand has
increased so quickly that arguably, the participation and actions of
developers, designers, constructors, and authorities with jurisdiction
have often been reactive. From
a construction perspective, this has generated what is perceived as a
specialty market with certain barriers to entry, and often worse, a lack
of barriers creating the potential for drastic failure.
There is much more to consider than the traditional construction
issues of sequencing, labor pools, cash flow, and the like. Constructors who wish to prosper in this specialty market
must also be keen to indigenous real estate trends, codes and code
enforcement that are often arduous and prohibitive of this locally
“new” type of construction, development issues related to financing
and market trends, the lack of relatively established design experience,
and economic response sensitivity. Key
Words:
Florida, Condominium, Coastal, Environmental, Permit |
Introduction
According to the US
Census, over 50% of the United States population lives in counties which border
oceans (United States Census Bureau, 1996).
The United States’ ports provide commerce and jobs for many Americans.
Additionally, many individuals desire the lifestyle provided by the
coastal areas of the country. The
high abundance of outdoor leisure activities, as well as pleasant climactic
conditions, makes the United States coastline a desirable destination for
tourism and permanent residence.
Over the last twenty
years, the State of Florida has capitalized on this leisure and tourism trend.
Florida’s population increased over 25% from 1985 to 1995.
The increase primarily stemmed from an influx of, among other things,
retirement age American citizens. The
increase in population of retired, wealthy individuals spurred and sustains a
construction boom in the state of Florida.
Lifestyle options, as well as an influx of wealthy new citizens, created
high demand for high-rise coastal development properties.
Coastal condominium
style properties in the state of Florida continue to be relatively high in
demand, including those in the Northwest panhandle section of the state.
Arguably, this section of the state boasts some of the most beautiful
beaches in the United States. Additionally,
one can easily drive to this area from many large population centers in the
southern United States, such as Atlanta, Birmingham, New Orleans, and Nashville. It is also a destination of choice for those traveling
further from Illinois, Michigan, Kentucky, Indiana, and other Midwestern States.
These conditions make properties in this section of Florida some of the
most desirable in the United States.
The condominium
construction market in Florida’s panhandle remains relatively stable, even
during the current economic downturn. The
competition for construction services in this market continues to increase,
however. Construction fees tend to
decrease with increased competition. This
situation proves challenging to the coastal constructor, who must find better,
more efficient ways to build these type projects.
The regulatory agencies in the area can prove a daunting challenge to
even the most experienced constructors. These
agencies often overlap jurisdictional responsibilities.
These agencies exist to protect the natural environment, protect the
rights of the property owners, and protect the rights of the local and state
populous. A constructor must find
ways to work with these agencies to construct a satisfactory project for all
parties involved.
Constructors involved
in beachfront construction must also deal with unique materials and methods.
The natural conditions and elements along the northwest Florida coast
require unique construction processes. Naturally
strong beachfront winds, as well as the potential for sustained hurricane force
winds, drive strict construction codes. Constructors
must verse themselves on how to properly construct beachfront projects in order
to succeed in this market.
Constructors also
assume the responsibility of protecting the natural coastal environment.
Many endangered or protected species of plants and animals make their
home along the Florida coast.
Large construction
projects can easily disrupt the habitat of creatures fighting for survival.
The coastal constructor must take care not to disturb or threaten the
fragile natural environment (Giattina, 2002).
Construction markets
tend to ebb and flow with economic conditions.
The protected environments along the Florida coast create a natural and
severe scarcity of available land. Contractors
who wish to construct coastal projects cannot limit themselves to small sections
of beachfront. They must obtain
licensure to construct in many counties and cities to maintain a sufficient pool
of potential development. Forecasting future markets can influence a constructor’s
future stability and profit.
Purpose of Paper
The purpose of this
manuscript includes four goals. First,
it will enumerate the primary components of project delivery in the specific
geographic area. Next, it will
expand these components through literature review, and a series of interviews
with current industry members associated with the development, design, and
construction of condominiums in Florida’s panhandle. This component expansion will also include perspectives of
the primary author of this manuscript, who spent 5 years in a construction
executive capacity responsible for the negotiation and delivery of over $80
million in related construction in this geographic area.
The manuscript will then recap via the development of an objective survey
generated and disseminated for industry feedback, and offer the authors’
discussion and interpretation of the data gathered in providing recommendations
for contractors interested in pursuing work in this geographic market.
Results
Primary Components - The primary
components of coastal construction are development, design and code enforcement,
and construction.
Success of the
development of condominium property on the Gulf Coast of Florida can generally
be reduced to proformas and profitability.
Obviously, there are other benefits and goals of developers including
satisfaction, sense of pride, etcetera, however this manuscript will limit
discussion to quantifiable topics. Proforma
and profitability analysis includes market demand, certain jurisdictional
authority requirements, land availability, permitting, and the cost of
capital/equity.
Design components
include jurisdictional authority requirements (particularly ASCE-7 wind codes),
aesthetics and appeal to condominium buyers, and project budget constraints.
Primary construction
components in this specialty market include subcontractor climate relations,
weather (heat, hurricanes), skin/roof and other water penetration
considerations, condominium associations, equity participation requirements, and
labor pools.
Development Components
General
Market Demand and Density Requirements
The short-term and
long-term outlook for the beachfront condominium market remains strong in spite
of current economic indicators. This
seems to stem from the current cost of capital, as well as stock market
conditions. Interest rates remain
at near all-time lows and show no signs of a drastic increase.
The favorable interest rates favor further development of real estate
assets. Additionally, current stock
market returns lead many investors to more favorable investments.
The current returns in the condominium market out pace financial market
returns (Lewis, 2002).
Developers will, on
occasion, require contractors to participate in the project’s equity.
This produces a vested interest by the contractor in the project, plus
often provides needed cash flow to release bank loan funding.
Communities along the
Florida coast establish density requirements to maintain the scenic beauty of
the area from over development. Density
requirements may include a maximum number of living units a potential investment
may construct, minimum number of parking spaces per dwelling unit, or proximity
of the development to other coastal features.
These requirements establish limits for the developer’s property and
impact potential income from the development. One example of how density
requirements can affect coastal development includes the establishment of the
Coastal Construction Control Line and the Fifty Foot Setback Line.
Buildings constructed before the establishment of the Coastal
Construction Control Line and Fifty Foot Setback Line receive exemption from
control line and setback directives. If
a developer obtains property adjacent to a “grandfathered” property, they
may receive some relief from the restrictions of the Coastal Construction
Control Line and Fifty Foot Setback Line. The
relief includes different density requirements for different development
options. For instance, developers
may build as close to the ocean as structures on adjoining properties, but
developers cannot construct as many units on the property as they might if they
built according to Coastal Construction Control Line and Fifty Foot Setback Line
stipulations (Lewis, 2002)
Scarcity
of Land
Government protection
of Florida’s Beach assets increased dramatically over the last thirty years.
As a result, little available land currently exists along the Florida
panhandle coast. Current
development stems from renovation or removal of existing properties with the
intent of reconstruction One
problem with this situation involves acquiring suitable existing properties.
Undesirable properties may surround potential development properties.
This may dictate future values of the property in question.
Additionally, new development projects may adversely affect the value of
existing properties surrounding the investment property.
Developers must play a delicate balancing act with in attaining the
“highest and best use” of the potential development property (Lewis, 2002).
Coastal
Construction Permitting
In 1972 the United
States Congress, in an effort to protect the ever decreasing coastal
environment, enacted the Coastal Zone Management Act.
The Act sought to protect or restore the natural coastal environment for
all to enjoy. The Act also
encouraged all states with coastal assets to develop comprehensive coastal
management plans.
The state of Florida
counts its beaches and dunes among its most valuable resources.
Many endangered and protected species make their home in this
environment. The beaches and dunes
provide residents of the state of Florida with recreation and tourism revenue.
The Florida State Legislature, seeking to protect these environments for
all, acted in 1971 (Hennessy & Grow, 2001).
Coastal
Construction Control Line, Mean High Water Line, and 50 foot Setback
Each county in the
state of Florida with sandy beaches stipulates its own Coastal Construction
Control Line. The Department of
Environmental Protection establishes these control lines.
The DEP sets the control line landward of any beach/dune system subject
to severe alteration under the influence of a 100-year storm, storm waves, or
other predictable condition. Once
established, the county governments record the Coastal Construction Control Line
in the public records (Hennessy & Thomas, 2002).
Under normal
conditions, construction may only commence landward of the fifty foot setback.
Surveys determine an average high water line as the basis for the
setback. The rules define
“permit” as a variation from the setback line. If the DEP establishes an erosion control line, then the more
landward of the two lines determines construction boundaries.
The DEP uses historical data and measurements to determine beach
topography over the next thirty years. This
data establishes the erosion control line (Hennessy & Thomas, 2002).
The Department of
Environmental Protection requires all parties wishing to perform construction
activities seaward of the Coastal Construction Control Line to obtain a
construction permit. The DEP may
order the adjustment, alteration, or removal of any structure seaward of the
Coastal Construction Control Line it deems dangerous, undesirable, or
unnecessary. The DEP uses its
jurisdiction over these lands to protect the beach and dune systems, as well as
upland structures and public interest in the nation’s seashores (Hennessy
& Thomas, 2002).
Department
of Environmental Protection
In 1971 the Florida
State Legislature effected legislation requiring the Department of Environmental
Protection (DEP) to establish a Coastal Construction Control Line along the Gulf
and Atlantic shores of the state. The
DEP uses historical data including, but not limited to, topography surveys,
erosion trends, storm tides, and vegetation data to determine the controlled
construction boundaries. In 1978
the Florida State Legislature changed the statute to allow counties and
municipalities to determine the Coastal Construction Control Line. Since 1971, all 24 Florida counties with sand beaches enforce
a construction control line (Hennessy & Grow, 2001).
Design and Code Issues
General
Design Issues
Architects designing
beachfront projects in the state of Florida encounter many unique design issues
not seen in other areas of the country. The
following facts illustrate this point (Lauer, 1999):
·
14 of the 30 most damaging hurricanes recorded between 1925 and 1995
struck the state of Florida;
·
80% of Florida’s population lives within five miles of the coast
(vulnerable to storm surge, flooding, and hurricane force winds);
·
Almost 30% of the population lives within a Category 1 Storm Surge Zone
(these areas represent the most frequently affected by hurricanes);
Wind
Forces
Wind codes have seen
recent dramatic changes, primarily in the wake of Hurricane Andrew.
The ASCE-7 code generally dictates all structural and skin design
requirements of buildings along the coast over 3 stories tall.
While the code establishes a minimum 110 mph design criteria, many local
codes (county, island authorities, etc.) supercede this code by increasing the
wind design criteria to 120 and 140 mph.
The Bureau of Beaches
and Shores, Technical Report No. 78-1 recommends using 140 miles per hour
wind forces as a minimum design threshold for beachfront construction.
The 140 miles per hour force exceeds the 100 year storm threshold
required by most zoning ordinances by 20 miles per hour.
A study conducted by the state of Texas indicates this design limit
should only increase the cost of building construction in the range of zero to
three percent (Jones & Johnson, 1982).
Appeal
to Buyers, Budget Constraints
Market appeal to
potential buyers is paramount in an increasingly competitive condominium sales
market. Designers must produce a
product that not only satisfies code compliance issues, but must also provide a
level of fit, finish, and amenities to attract buyers for preconstruction sales.
Generally, bank funded loans will require up to 75% of unit buyout before
closing on the loan, so buyers must purchase from architectural drawings,
renderings, and similar marketing type presentation material.
This becomes an arduous task for the designer, as this level of design is
usually completed prior to contractor involvement, generating the risk of budget
problems for the developer. A
concept that is marketed and sold, but that later proves too costly for the
development proforma can be disastrous for all team members.
Construction Issues
Subcontractor
Relations and Labor Pools
The subcontractor
market in the panhandle region is generally different than that of inland
construction. Subcontractors in
this area often are relatively transient, and many have no long term history.
While many are quite capable of handling a project of this type, general
contractors should be deliberate in researching potential subs for condominium
projects. Labor availability,
appropriate insurance and bonding, and cash flow are usual sources of
subcontractor difficulties in this area.
Similarly, a general
contractor will find labor supplies short in the panhandle area, as, excepting
government and military projects, beachfront construction generally represents
the bulk of commercial construction in this area.
Weather
Issues
While the Florida
coast provides year-round recreation to the residents and tourists visiting the
beaches, these same conditions can prove detrimental to coastal structures.
The blazing sun of the Florida coast wreaks havoc on roof systems in this
section of the country. The sun and
ocean currents generate powerful storms and hurricanes off the Florida coast.
These storms produce wind driven rains which can penetrate even the most
carefully weatherproofed building skin systems. Constructors must make themselves aware of these conditions
and execute high quality construction procedures when constructing beachfront
properties (Rawson, 1979).
Roof
Systems and Skin Issues
Condominiums with
so-called “flat roofs” receive ample abuse from sun and rain. The constructor should purchase a roofing system that will
remain flexible for long periods of time. Liquid
plasticizers in roof membranes tend to migrate out of the roof material within
five to ten years. This situation
results in a brittle roof material. The
roof material may crack under the weight of a single person causing leakage or
other undesirable results (Rawson, 1979).
Pooling water can
also allow prolific algae reproduction.
The algae can bite into an asphalt roofing system causing severe water
damage to the structures interior. Rubberized
roof membranes tend to fair better against algae damage (Rawson, 1979).
Construction defects
in condominium skins systems can allow water to penetrate to the habitable space
of the structure. This situation
can lead to a multitude of problems. The
constructor may find himself in a courtroom defending against claims made by
condominium residents. Some of the
problems include water damage to structural and finish systems in the
condominium. Courts may require
constructors to pay for or repair damage caused by water penetration resulting
from shoddy workmanship. Water
penetration may lead to mold or fungal growth within the structure.
These growths may lead to or aggravate asthmatic conditions of the
condominium residents (Morey, 1996).
The
Condominium Association
One of the unique
challenges facing the beachfront condominium constructor involves a lasting
relationship with the condominium association.
Condominium associations involve multiple owners.
This means the constructor must deal with multiple personalities.
The problems most often arise when a warranty situation develops (Morse,
2002).
The contractor must
balance the desire to do repeat business with the need to protect thin profit
margins. With so many owners
involved in the condominium association, the constructor often returns to
perform maintenance items rather than warranty items.
An example of a warranty would include a heating and cooling system
malfunction within the warranty period. A
constructor must repair or replace this item under the obligations of the
warranty. A member of the
condominium association might ask the constructor to return to replace a door
off its hinges. The latter
situation clearly falls in a maintenance category (Morse, 2002).
The Authors’ Conclusions and
Recommendations
Contractors wishing
to capitalize in the Florida panhandle condominium construction market should
develop and maintain a defined approach to avoid pitfalls that have produced
many casualties in the past. The
relationship with the developer is first and foremost, and should include an
analysis of his presence & financial sustainability.
It should also include a review of his local track record, as well as a
review of the overall performance and bank loan information.
Equally critical is a
review and understanding of the contract documents before
entering into any contract of commitment. Items
that must be addressed / determined include completeness of the drawings, a
review of code sensitive issues [structural integrity, life safety, etc.],
products and materials specified, and an understanding of accountability of the
design and construction parties as understood by the developer.
Finally, the
constructor must have a firm grasp on an appropriate contractual relationship to
minimize changes, define dates and associated finance issues, and provide a
complete source of remedy in the event some discrepancy arises.
The contractual arrangement and any other implied or understood structure
should insulate the builder from unnecessary communication with condominium
buyers, and should explicitly address the relationship with the condominium
association during and after construction is complete.
References
Hennessy, K. S. Esq.
& Grow, J. M. (2001). Florida
Coastal Construction Permitting. [WWW document]
URL www.llw-law.com/article6.cfm
Hennessy, K. S. Esq.
& Thomas, G. (2002) Florida Coastal Construction
Permitting.
Presented at the 2002
Florida Chamber's Permitting Summer School at Marco Island.
[WWW document] URL www.llw-law.com/article18.cfm
Jones, C. P. &
Johnson, L. T. (1982) Coastal
Construction Practices. Marine
Advisory
Bulletin MAP-23 Florida Sea Grant College Program.
Lauer, N. C. (1999). Paying
for Paradise. Research
in Review. Spring and Summer
1999.
Morey P.
(1996). Mold Growth in
Buildings: Removal and Prevention. Proceedings
of Indoor Air '96, Nagoya, Japan. Vol.
2:27-36
Rawson, Jr., M. V.
(1979, October 25). Guidelines for
Hurricane Resistant Construction Community
Resource Development. Conducted
by: The Alabama Cooperative Extension Service.
United States Census
Bureau. (1996). Population in Coastal Counties: April 1, 1990 and July 1, 1994.
Washington, DC. [WWW document] URL
http://www.census.gov/population/estimates/county/9094cstl.txt
Interviews:
Lewis,
Jimmy (2002, October 18)
Lewis Investment Company, 2140
11th Avenue South, Birmingham, AL
35205
Giattina,
Chris (2002, October 18)
Giattina, Fisher & Aycock, 2031
11th Avenue South, Birmingham, AL
35205
Morse,
Roger (2002, October 18) Bill
Harbert Construction, 820 Shades
Creek Parkway, Birmingham, AL 35209